Water Tank Manufacturing
Factory Overview
The aerial and entrance photographs show the confirmed HONGLIANG factory site. They provide context for the facility behind our water-tank work without implying additional sites or production capacity.
Manufacturing Process
Workshop photographs show formed tank panels beside press equipment, roller equipment with metal profiles, and welding of metal components. They document visible manufacturing steps without defining every product’s process sequence.
Tank Construction & Engineering Review
The workshop photographs above document metal panel forming, roller processing and welding. Use the construction-specific checks below when reviewing a proposed tank and its installation.
| Tank family | What to review |
|---|---|
| Stainless Steel Water Tanks | Pressed stainless steel panels form the enclosure. Review the proposed grade against water chemistry, then check joint access, supports and connection positions. |
| Insulated Water Tanks | The inner tank, insulation and outer skin serve different purposes. Confirm the temperature range and hold time, and check continuity around openings and pipe connections. |
| BDF Underground Water Tanks | For the proposed buried composite-panel assembly, review panel specifications alongside groundwater, cover loads, the empty-tank condition and permanent maintenance access. |
| GRP / FRP Water Tanks | GRP / FRP uses sectional composite panels. Check resin and seal compatibility, base supports and clearance for assembly against the proposed water duty. |
| Ribbed Panel Water Tanks | Use dimensioned elevations to coordinate rib locations, connections and support points. Confirm the material grade and space available for assembly. |
| Lined Water Tanks | The lining provides the water-contact surface. Review substrate condition, preparation access and the proposed details at joints, outlets and other penetrations. |
| Galvanized Steel Water Tanks | For a galvanized steel assembly, review coating compatibility with the stored water and the proposed protection at joints. Leave access for inspection. |
For pumps, pipework and tank connections, see Water Supply System Integration.
Structural Analysis & Engineering Design
Developed with Japanese experts, HONGLIANG’s force-analysis approach uses numerical models to review selected water-tank panels under defined loads and supports. Each project needs its own design review.
Structural Layout
Compare panel layout, bracing and supports.
Plate Selection
Assess plate thickness and configuration.
Load Response
Review predicted deformation under load.
The catalogue compares 1.0–3.0 mm plates near 10 mm centre displacement using water pressure in kPa. A separate fixed-edge 3 mm model at 0.1 MPa predicts about 11 mm displacement.
View four supporting analysis figures and model conditions
The original table and mesh support the panel and tank examples above. The 0–20 s acceleration input in m/s² and response contour are simulated seismic figures; they do not represent a physical seismic test or an approved seismic grade.




These model results are not physical tests, third-party certification or a general seismic rating. Confirm project geometry, materials, supports and loads. Share project requirements for review.
Quality & Compliance Documents
These dated documents have different holders, scopes and purposes. Current register or patent status has not been independently verified. Management-system certificates are not product approvals; sample results apply only to the submitted sample and report conditions.
Product Certification & Testing
Management System Certificates
Patents & Technical Documents
Company Registration

Business Licence — Redacted Copy
广东宏量环保设备有限公司. Copy stamped 24 Apr 2026; establishment recorded 21 Oct 2013. Personal name and scannable codes are masked. Registration context.
Document Scope
For a selected tank and intended use, request configuration-matched documentation. Printed dates do not establish current register status.
Project Specifications & Documentation
A clear project brief helps identify which drawings, material details and inspection records should be reviewed before an order.
- Intended water use and target storage capacity.
- Indoor, outdoor or underground location, available footprint and access.
- Site conditions, foundations, connections and any groundwater or cover-load considerations where relevant.
- Available drawings and the technical or inspection documents requested by the project.
Use the selection-based project brief to share what is known. Uncertain details can remain open for discussion.