Ribbed Panel Water Tanks
The formed ribs visible in the panel face distinguish this tank from conventional pressed-panel construction. Select the panel arrangement from drawings that locate joints, openings and supports.
Request a specification review →
Restricted layouts and coordinated pipework
Where a plant room fixes the positions of pipework and access openings, compare actual panel elevations before selecting a profile. The rib arrangement affects which locations can accommodate an opening.
Specification brief
| Design input | What to establish |
|---|---|
| Construction | Formed rib profile |
| Operating duty | Layouts with constrained connection positions |
| Selection check | Material grade and nozzle locations |
| Site drawing | Dimensioned elevations and assembly clearances |
Profile and water-contact material
Ask for the proposed material grade, panel dimensions and connection details. The rib pattern is a geometric feature; it gives no standalone pressure or load rating.
Penetrations and assembly clearance
Provide a dimensioned elevation showing penetrations, doors and adjacent services. Reserve space for installation and inspection of each connection, including the faces closest to walls.
Inspection and maintenance
Keep a record of the as-built connection positions. Check accessible seals and panel joints when inspecting the tank, especially after changes to adjacent pipework.
Compare your options
Compare the ribbed elevation directly with the pressed-panel alternative at the same footprint and usable volume. Resolve clashes before selecting either fabrication layout.
Compare Stainless Steel Water Tanks · Water tank selection guide
Can a nozzle be moved to clear a rib on site?
Submit the revised position for review against the panel and joint arrangement before fabrication or site modification.
Request a project review
Send the project location, required usable capacity and a dimensioned site plan. Include the water duty and operating temperature. For this configuration, highlight dimensioned elevations and assembly clearances.



