Lined Water Tanks
A lining supplies the water-contact surface while the supporting structure carries the storage loads. New construction and refurbishment therefore need separate checks for the lining and its substrate.
Request a specification review →
New lined vessels and existing tank refurbishment
For an existing tank, provide a condition survey and photographs of corners, joints and penetrations. Decide whether the structure can remain in service before comparing a new lining with tank replacement.
Specification brief
| Design input | What to establish |
|---|---|
| Construction | Lining and supporting structure |
| Operating duty | New vessels or refurbishment |
| Selection check | Water duty and substrate condition |
| Site drawing | Access for preparation and lining inspection |

Lining and stored water
State the required water quality, treatment chemicals, temperature and cleaning regime. Request the lining material, joint details and evidence for the intended contact conditions.
Substrate, access and penetrations
Mark the hatch, inlet, outlet and drain on a section drawing. Plan how materials enter the tank, how the substrate is prepared and how completed connections will be inspected before filling.
Inspection and maintenance
Agree inspection methods that will not damage the lining. Record the condition of seams, penetrations and terminations during an outage.
Compare your options
A lining can change the wetted surface of a suitable supporting structure. A new sectional tank also provides a new enclosure; compare the two options after the existing structure has been assessed.
Compare Stainless Steel Water Tanks · Water tank selection guide
Can a lining repair a structurally deficient tank?
The supporting structure needs its own assessment. Repair or replacement of deficient support must be addressed before the lining is selected.
Request a project review
Send the project location, required usable capacity and a dimensioned site plan. Include the water duty and operating temperature. For this configuration, highlight access for preparation and lining inspection.



